Save resources - from the beginning

Building products have an impact on the environment - even before they are installed. That is why sustainable building takes into account energy and resource consumption as well as emissions as early as the manufacturing phase. The life cycle assessment creates comprehensive transparency.

You can exert an influence right from the start - by including the life cycle assessment of quantity-relevant building materials such as steel and cement as well as products for interior finishing and the building envelope in the planning.

Smart-Living Weinstadt Modernes Zusammenleben

Award:DGNB Pre-Certificate in Platinum
Usage profile:New Construction Residential Buildings, Version 2018
Project location:Weinstadt, Germany
Applicant:KOP GmbH
Building owner / Investor:SLW GmbH & Co. KG
DGNB Auditor:Takacs, Attila for: KOP GmbH
ENV1.2 Local environmental impact

Our objective in the criterion "Local environmental impact" is to reduce, avoid or substitute all hazardous or damaging materials, (construction) products and preparations that may affect humans, flora and fauna or cause short-, medium- and/or long-term damage.

ENV2.2 Potable water demand and waste water volume

Our aim of the criterion "Potable water demand and waste water volume" is to preserve the natural water cycle and reduce the demand for drinking water by recycling waste water and using local resources.

ENV1.1 Building life cycle assessment

Our aim of the criterion "Building life cycle assessment" is a consistent life cycle-oriented planning of buildings in order to reduce emission-related environmental impacts and the consumption of finite resources to a minimum throughout all life phases of a building.